Nuclear Power PlantThermal power plant, primarily used for electricity generati... Niederaichbach/Isar, CO2-cooled, D2O-moderated pressure tube reactorNuclear reactor in which the fuel elements are contained wit... with an electric gross output of 106 MWMegawatt, million times the power unit of watt (W). 1 MW = 1..., nuclear commissioning on 17th December 1972. The plant was shut down a short time later for economic reasons resulting from the fast and successful development and introduction of the pressurized and boiling water reactorNuclear reactor with water as a coolant and as a moderator, ... lines. The plant was initially transferred into safe enclosure. On 6th June 1986, the licence for the total elimination was granted. On 17th August 1995, all disassembly work was completed and thus the “greenfield” condition restored for the first nuclear power plantThermal power plant, primarily used for electricity generati... in Germany.