Nuclear Power Plant Isar-2 in Essenbach/Isar, unit 2, pressurized water reactor with an electric gross output of 1,485 MW, nuclear commissioning on 15th January 1988.

Every year Isar-2 generates roughly 11 billion kW/h of electricity which is about 12 % of all the electricity produced in Bavaria and enough to supply 3.5 million households for a year.

Following the amendments to the German Atomic Energy Act, Isar-2 will have its permit to generate power withdrawn at the end of 2022.

Isar-2 has permanently been shut down on 15th April 2023. Lifetime generation: 368.25 TWh